Murata Machinery USA
C H & Sons Construction Inc. completed phase one at the Murata
Machinery Plant in the summer of 2007. The project is comprised of a
10,000 SF building addition. Details include:
- Pre-engineered metal building
- One truck dock
- Complete site work
- Retention pond
- Asphalt Paving parking lot
Phase two was a Retro-fit that added an additional 8,000
square feet to the existing building. Within the existing building C H &
Sons added an additional 120 feet to the existing 40 feet of crane track .
This project was completed in December 2007.