Freightliner—Pool 1 Docks -
Mount Holly, North Carolina
Designer: Perigon Engineering – Jeff Larson P.E.
In the fall of 2008, C H & Sons self-preformed the Pool 1 Dock project at Freightliner in conjunction
with the CIW Dock Expansion. The scope of work involved steel fabrication, concrete work, and cutting
out the existing pre-cast wall sections in order to install the roll-up dock doors. In addition to this
scope, two dock pits were incorporated into existing slabs to accommodate two dock levelers.