Freightliner—Pool 1 Docks - Mount Holly, North Carolina



Designer: Perigon Engineering – Jeff Larson P.E.

In the fall of 2008, C H & Sons self-preformed the Pool 1 Dock project at Freightliner in conjunction with the CIW Dock Expansion. The scope of work involved steel fabrication, concrete work, and cutting out the existing pre-cast wall sections in order to install the roll-up dock doors. In addition to this scope, two dock pits were incorporated into existing slabs to accommodate two dock levelers.


 